Following the design and planning phase, the on-site build is typically completed in a matter of weeks, not months. The use of ground screws significantly shortens the foundation stage compared to traditional concrete. Also, the use of SIP panels over a timber frame saves time.
![About Us Image | My Outhouse About us image [city]](https://myouthouse.co.uk/wp-content/uploads/2025/09/About-Us-Image.png)